What a PM can hand over: ten everyday jobs
The page to bookmark. Each job with the before and the after, the prompt to copy, what to give it, and what you still check yourself.
Page 4 of 7 · Last checked
Ten jobs a project manager can hand over, each with the before and the after, what to give it, and what you still check yourself. The prompt library has the prompt for each, ready to copy. None of them replaces the judgement, the relationship or the signature.
The ten jobs
Status report from raw notes
Before
Ninety minutes on Friday afternoon rewriting notes into the board’s template.
After
Notes and last week’s report uploaded: “update the report; mark what changed; keep the RAG colours.” Fifteen minutes of editing.
Meeting minutes to actions
Before
Minutes typed up two days later; the actions lost on the way.
After
Notes pasted or a recording transcribed: “extract decisions, actions with owner and due date, open questions; as tables.”
Risk register, first draft
Before
A blank register and a brainstorming meeting nobody scheduled.
After
Charter and WBS in: ten project-specific risks with cause, effect, likelihood, impact and an owner role, to argue with in the meeting.
Stakeholder email in the right tone
Before
An hour choosing words for the “we are slipping two weeks” email.
After
“Sponsor, not technical, values honesty and a plan; three paragraphs; formal but warm” - three versions to choose from.
Schedule what-ifs
Before
“What if the permit lands three weeks late?” goes unanswered until it happens.
After
Milestone list uploaded: “if milestone 4 slips three weeks, which later milestones move and what can run in parallel?”
Reading an RFP or a statement of work
Before
Sixty pages, one evening.
After
“List every deliverable, deadline, acceptance criterion and every clause that assigns risk to the contractor; quote the clause number.”
Lessons-learned synthesis
Before
A retrospective that produces a list nobody reads again.
After
Three retrospectives’ notes in: “group into themes, name the recurring ones, propose one change per theme.”
Change request write-up
Before
A two-line request in an email, and a form nobody wants to fill in.
After
A structured change request: impact on scope, schedule, cost and quality, alternatives, and the questions to answer before approval.
Translating and levelling
Before
A technical vendor update forwarded to a sponsor who cannot use it; a Macedonian report the regional office cannot read.
After
The update levelled to three sentences a sponsor can act on; the report in English with the terminology kept consistent.
Preparing for the difficult conversation
Before
The meeting with the sceptical sponsor, rehearsed in the car.
After
“Play the sponsor; push back on my plan; be tough.” Ten hard questions before the real ones.
Every prompt above is in the prompt library, filterable by job. Before any of it leaves your hands: trust, but check.
Last checked by Petar Trajchevski. Product names and settings paths were walked through on that date; the concepts do not move. Report a change